814-695-7500

The bridge serves as a gateway to the downtown area and as a virtual link to the Altoona Regional Health System.

Client: City of Altoona, Blair County, PA

January 6, 2016

Bridge Solutions

P. Joseph Lehman, Inc., Consulting Engineers was the design consultant for the 7th Street Bridge replacement in the City of Altoona, Blair County, Pennsylvania.  It connects State Route 764 on the eastern side of the Norfolk Southern Railroad tracks to Chestnut Avenue, and the 10th Avenue Expressway on the western side of the tracks. The bridge serves as a gateway to the downtown area and as a virtual link to the Altoona Regional Health System. The scope of work included the intersection of 7th Street, and continued along 7th Street to the intersection of 7th and Howard Avenue. Work also included the rehabilitation of Chestnut Avenue between 4th and 7th Streets, box culvert construction, MSE retaining walls, utility relocations, and the rehabilitation of the 8th Street Bridge. The project had a construction cost of $10 million.  It was funded through federal (80%) and state (20%) monies.

17thStreet_s2
17thStreet_s1

 

Comments are closed.